Social Icons

Pages

Showing posts with label Three. Show all posts
Showing posts with label Three. Show all posts

Sunday, 20 March 2016

75m Three Masted Schooner



Throughout the venerable eighty-year history of Sparkman & Stephens, less than a dozen yachts have been designed with a schooner rig; however, those that have been have led illustrious lives - such as Brilliant, So Fong, and Santana.

A desire for ease of handling directed most clients to sloops, ketches and yawls. Today, modern technology allows a schooner rig to be handled as easily as a sloop. Computer-controlled furling booms, hydraulic roller furling head, fisherman sails, and lightweight spars contribute to the ease of operating the intricate set of sails inherent in the schooner rig.

Below decks, S&S has designed a layout that will accommodate ten guests in five staterooms. Two of the staterooms are fitted with queen berths and two with convertible sliding twin beds. The owner's stateroom has a dedicated staircase leading down from the main deck as well as his and her bathrooms. A hidden crew entrance from the lazarette, allows the cabin to be serviced without disturbing the owner or guests.

Located amidships is a two-tier engine room which houses the diesel-electric propulsion system, along with the rest of the ship's machinery. The brains of the system, including all electronic components, are located in a dedicated control room which has 270-degree views of the machinery space. All systems can be centrally monitored and managed from this climate controlled and sound-proof space. Much of the electronic equipment is mimicked in the fully appointed wheelhouse, allowing observation and management from multiple locations.

A full beam mail salon affords picturesque views from large deckhouse windows. Leading further aft to port is a quaint sitting area and guest office; to starboard, the owner's private office. A small service pantry is located at the aft end of the house for crew convenience when dining al fresco on the main desk. Additional al fresco dining is situated on the flybridge deck along with outdoor cooking facilities.


Length Overall: 247'-0"
Length Waterline: 192'-0"
Beam: 39'-10"
Draft, Daggerboard Up/Down" 15'-0"/24'-7"
Displacement: 834 LT


Read More..

Monday, 5 December 2011

Three Easy Ways to Improve Your Home


Home improvement is a great investment of time and money. A home is a sanctuary; the safe place that separates you from the abrasive world outside. Making it as nice as you dream is part of the fun. An enjoyable project provides satisfaction, and improves the home.

Fresh Exterior Paint

Changing the color of the home creates dramatic change without breaking the bank. If the home cries for paint because the last paint job is flaking off little by little, this project is your priority. The things you need are:


•Paint scraper.
•Masking tape.
•Paint brushes and rollers.
•Drop Cloth.
•Paint thinner.
•Paint primer.
•Paint.


Scrape loose paint off the walls. Well-adhered paint will stay in place. Prime the areas that are bare; paint will only stick to paint or primer. Buying a good, 15 or 20-year paint is worth the investment. The quality outweighs the extra cost; you get better coverage, so you buy less paint. Use the drop cloth to protect the area directly below you. A medium quality brush for priming may be acceptable, but you should not use a cheap brush to spread high quality paint. A layered camel hair brush delivers the best result. Soak it in paint thinner before hand washing. Use a roller on the smoother surfaces.

Interior Paint

Mask interior surfaces for protection. Remove smaller furnishings and decorations from the project room. Center large items and cover with a drop cloth; they are out of the way, and protected. Interior paint swatches do not match semi-gloss paint. The shiny finish makes cleaning easier, but the glare ruins the mood that could have been. The solution is flat interior paint.

Patio Deck

If you know your way around a set of power tools, consider adding a backyard deck. The deck is an inexpensive way to add living space to your home. Decide what design fits best with your yard and home, and then go to the lumberyard. There are readymade deck plans available. Lumberyards sell deck “kits.” The package-price includes all the hardware, and lumber needed.

Important Things to Consider

There are many ways to improve your home. If you enjoy improvements, but not actually doing the work, consider hiring someone. Most contractors do free estimates. Only accept estimates in writing. A licensed contractor carries liability insurance; this protects you from damages due to negligence. A licensed contractor includes a city permit in his estimate.

Protecting your sanctuary from intruders gives you peace of mind. Consider a home alarm system as you review the home-improvement budget. Modern designs are convenient. Family members memorize a code; the system secures each entry in this manner. The cost of the alarm system is preferable to the cost of losing valuables or sleep.

Your home is likely your biggest investment. Making improvements keeps it nice, and adds to the pleasure of owning it. Are you going to take on a project? Decide what is right for you, make a plan, and dive in.
Read More..

Tuesday, 12 October 2010

Frigging with the Rigging and the Tale of Three Blocks


April 28, 2015

When we purchased our Whitby 42 ketch the standing rigging was over ten years old so a comprehensive rigging inspection report was required by the insurers before they would issue full cover for our boat.  The rigger we used was extremely thorough and documented a long enough list of problems that we decided to bite the bullet and commission a full, masts out, re-rig of ‘Our Dreamtime’ to provide the peace of mind that only all new stainless steel can provide.

Lifting the masts off 'Our Dreamtime' for the re-rig
She simply didn't look right as a motor boat - although our neighbour suggested a flybridge would help.
With the masts laying on stands in the boatyard, every fitting could be very closely inspected and replaced if any doubt was found regarding its integrity. We also took the opportunity to replace all the electrical wiring running down the mast, fit new lights, wind instrument and even the latest and greatest mast top TV antennae.

 Meanwhile back on the boat, we dismantled all sorts of cabinetry to get access to and remove every chainplate that the rigging attaches to. Thank heavens we did as we found a number suffering stress cracks. Bolting the new rigging to these would have been like pitching a circus tent with plastic tent pegs, a recipe for eventual disaster.

Just getting access to the chainplates was a task and a half.

An old coat of paint can hide many sins

All chainplates were removed, cleaned up as shown then crack tested and sent to be polished
The project took longer than anticipated and a lot more money than we expected but, when all was done and we came back to the dock after completing sea trials, we felt very satisfied that all the effort had been worth it. We’d now done EVERYTHING that could be done to ensure our rig was as good as it could be. Or so we thought. The rigger had spotted a small crack in the triple block at the base of the mast that the main sheet and preventer lines run through. When he pointed it out we quickly agreed we should replace it also.

The small crack in the block.
‘You can’t get those old type blocks anymore,’ he said. ‘I’ll order you a new style one and drop it down to the boat for you when it arrives but the old one should be fine in the meantime as long as you don’t go out in any gales.’

After being dock bound for months while the re-rig was completed, we then took every opportunity to throw the lines off and sail our boat. A couple of weeks later the replacement block arrived and $208 disappeared from our bank account. Karen and I sat comparing this new piece of mainly plastic kit to our old, sturdy looking stainless steel example and we both commented that you don’t get much for a couple of hundred dollars these days. It was then put in a locker stacked with other spare bits and pieces with the intention of fitting it when we got the chance.

For the next few months every time we would head out for a few days sailing in Moreton Bay we’d get underway and then think, ‘We probably should have swapped those blocks before we left’ but never actually got around to it.

We were, however, progressively replacing our running rigging and when the day came to run a new main sheet it would have been plain stupid not to replace the block it ran through at the same time. The new, flat black plastic version was finally in place just before the Easter weekend.

Easter Sunday saw us set a course for a 13 nautical mile downwind sail to Peel Island in a modest 12-15 knot breeze. We enjoyed a very relaxed run in the sunshine and were having a great time. That was until we gybed the boat around the point to head into our anchorage at Horseshoe Bay.

We are cruisers, not racers, and very conservative sailors. As such, tacks and gybes are performed in a very slow and controlled manner so as to not stress either the boat or crew. We bring the boat around sedately and use the main sheet and preventers to bring the boom across as we go so it eventually just flops across a short distance before being eased out to where we want it.

Despite our gently, gently approach, as the boat came about and the breeze took the boom across our new block exploded with the starboard preventer line and bits of black plastic spread all over the deck. So much for the new technology. Suffice to say we were unimpressed that our $200+ block was apparently built to last for many  years or one gybe, whichever came first.

At $200 per gybe this type of block could get expensive

Once anchored, we swept up all the bits into a plastic bag to send back to our rigger with a ‘please explain’ and our trusty old block came out of the spares locker and back onto the mast where it had successfully lived for a decade or more, but not before taking note of the make and serial number stamped into its stainless steel construction. Ten minutes at the keypad interrogating our favourite know it all, Mr Google, about ‘Cleveco – Made in New Zealand’, and we discovered a Kiwi marine store whose online catalogue listed blocks that looked remarkably like the one we had that ‘you can’t get anymore’.

For something 'You can't get anymore' our new block looks remarkably like its older brother that served so well
A week later a shiny new stainless construction block was delivered to our door from NZ for $30 less than the plastic thing had cost. It now resides on the base of the mast where we hope it will serve us as well as its older brother. Meanwhile old faithful has again been retired to the spares locker but seems ready and eager to serve again if needed.

Next time someone tells us ‘You can’t get that anymore’ we’ll be heading straight to Google.



 
To stay right up to date with what we’re up to  and see lots more photos check out and 'like' our Dreamtime Sail Facebook page at Dreamtime Sail on Facebook

If you have only recently discovered our blog and would like to read how it all started, or work through our previous adventures, click the link to go back to our first blog entry. Stuff it. Let's just go sailing anyway.  We hope you enjoy reading the previous posts to catch up on our story.




 

Read More..