Social Icons

Pages

Saturday, 3 November 2012

Launch Day


Click on any picture to enlarge it. Blog starts with the September 23rd post.


Filled with anticipation, my son Andrew and I carried the boat to the shore just before sunset on a beautiful sunny day. The long weeks of work are about to pay off.

I had left one of the leeboard mounts at home so only the right hand one was in place. Should be good enough for a test run.


The sail rig is simple but still allows lots of opportunity for tuning. I'm learning as I go along.


Time to get the boat wet. We donned our PFD's and put it in the water.

As a precaution, I lashed the rudder mount in place so that it wouldn't pop out of the mounting eyes. I also added a restraining line to the tiller extension so that it wouldn't get out of reach if I let go of it.

Off we go. The canoe is very light and easy to handle.

Winds were light and steady out of the west as we set sail.

The first sail ended early with a broken leeboard mount, but it left us looking forward to another sail the following day.

I drove home to pick up the missing leeboard mount, then reinforced both mounts with screws to back up the glue joints.

The next day, we were down at the beach bright and early, eager to start out.

The sails have a few wrinkles in them but they should work just fine.


Returning from the first run, we pronounced the venture a success.

I later improved the set of the sails by tightening the luff (front edge) to eliminate the twist in the upper spar. I also moved the leeboard bracket back so that the passenger could sit in front of it and use it as a backrest.

Back at the dock, daughter Jane climbed aboard.

The canoe heels a little when the wind hits the sails, then it stiffens up. The stability is impressive. I later stood up in the cockpit and it didn't feel tipsy under foot at all.

The canoe was an eye-catcher in the harbor, garnering many thumbs up and favorable comments.

I set a goal of completing the boat in three months, and I made it, just barely. Remaining items to complete are; install the access hatches in the bulkheads, and replace the pine masts and spars with lighter weight Sitka spruce.

No comments:

Post a Comment